← Topical Vault

Inventory management Revision notes

Unit 4: Operations management · Chapter 24 · about 10 minutes · written for the 9609 syllabus · last checked 2026-11-18

Holding inventory is a balancing act: too little and the business runs out, losing sales; too much and cash is tied up in goods sitting on shelves. This chapter covers why businesses hold inventory, how they control it, the importance of the supply chain, and the just-in-time approach. Paper 2 often includes an inventory control chart to read, and asks whether a business should adopt JIT.

Why businesses hold inventory

Inventory comes in three forms:

  • Raw materials and components, waiting to be used in production;
  • Work in progress, partly finished products;
  • Finished goods, waiting to be sold.
Benefits of holding inventoryCosts of holding inventory
Production can continue if a delivery is lateOpportunity cost: cash tied up that could be used elsewhere
Sudden rises in demand can be met, avoiding lost salesStorage costs: warehouse space, security, insurance
Bulk buying discounts on large ordersRisk of goods becoming damaged, stolen, out of date or out of fashion
Seasonal goods can be built up in advanceHandling and administration costs

Holding too little inventory has its own costs: production stops, orders are lost, customers go to competitors, and many small orders cost more to process.

Controlling inventory

Buffer inventory: the minimum level of inventory kept to cover unexpected delays or rises in demand.

Re-order level: the level of inventory at which a new order is placed.

Lead time: the time between placing an order and the goods arriving.

Re-order quantity: the amount ordered each time, which brings inventory back up to its maximum level.

An inventory control chart: stock falls by 300 units a week; when it reaches the re-order level of 500, 800 units are ordered; they arrive one week later (the lead time), just as stock reaches the buffer level of 200 Inventory (units) Weeks 0 1000 maximum 500 re-order 200 buffer lead time 2 4 6
Inventory falls as it is used; an order is placed at the re-order level so that it arrives just as inventory reaches the buffer level.

re-order level = buffer inventory + (usage per week × lead time in weeks)

Example from the chart: buffer = 200 units, usage = 300 units a week, lead time = 1 week, so the re-order level = 200 + 300 × 1 = 500 units. The re-order quantity = maximum − buffer = 1,000 − 200 = 800 units.

Reading a chart: if usage rises or a delivery is late, inventory falls into the buffer, which is exactly what the buffer is for. If it keeps happening, the business should raise its re-order level or buffer, or find a more reliable supplier.

Supply chain management

Supply chain management (SCM): managing the whole flow of materials, components, information and finished products, from suppliers through production to customers.

Good SCM means reliable suppliers, good communication (often shared computer systems), fast and efficient transport, and close coordination of production with demand. It matters because a business is only as reliable as its supply chain: one late or poor-quality supplier can stop production and disappoint customers. Benefits include lower inventory and costs, faster delivery, better quality and the flexibility to respond to changes. It is especially important for large retailers and manufacturers that depend on many suppliers.

Just in time (JIT) and just in case (JIC)

Just in time (JIT): an approach in which materials and components arrive exactly when they are needed for production, and products are made to order, so very little inventory is held.

Just in case (JIC): holding substantial inventory, including buffer inventory, so the business is protected against delays and sudden rises in demand.

Advantages of JITDisadvantages of JIT
Lower storage costs and less cash tied up in inventory, improving cash flowDepends on very reliable suppliers; one late delivery stops production
Less waste from damaged or out-of-date stockCan’t meet sudden rises in demand quickly
Space freed for productionLoses bulk-buying discounts; higher ordering and delivery costs
Encourages quality, as there is no spare stock to cover faultsNeeds sophisticated ordering systems and close supplier relationships

JIT suits businesses with predictable demand, reliable local suppliers and good IT systems. JIC suits businesses with unpredictable demand, unreliable or distant suppliers, or where running out would be very costly (hospitals holding medicines). Recent supply-chain disruptions have led some businesses to hold more inventory again.

Answering the Paper 1 and 2 questions

Typical questions: “Evaluate whether RCR should introduce just in time”; “Evaluate the importance of improved supply chain management to ZF’s future success” (Paper 2); or “‘Supply chain management is the most important operations factor for the success of a large internet retailer.’ Evaluate this view” (Paper 1).

In Paper 1 Section B you answer one two-part essay: part (a) for 8 marks and part (b) for 12 marks. Each Paper 2 question ends with an 8-mark part and a 12-mark part. The 12-mark parts must include evaluation, and long answers are marked on knowledge, application, analysis and evaluation. Plan every long answer in the same five steps, in this order:

  1. Knowledge: define inventory, buffer inventory, re-order level, lead time, supply chain management, JIT and JIC.
  2. Application: apply them to the business: what it holds in inventory, how predictable its demand is, how reliable and close its suppliers are, and any chart or figures given.
  3. Analysis: build chains: for example, JIT cuts the inventory a restaurant holds, so less food is wasted and less cash is tied up, but a late delivery could leave it unable to serve dishes, losing customers.
  4. Evaluation: weigh the savings against the risks for this business: supplier reliability, demand patterns, the cost of running out, the investment in systems, and recent supply disruptions.
  5. Conclusion: make a justified judgement, for example: the business should introduce JIT for its perishable ingredients, where waste is high and local suppliers are reliable, but keep a buffer of items with long lead times.

Check yourself

Name the three forms of inventory.

Raw materials and components, work in progress, and finished goods.

Buffer inventory is 150 units, usage is 50 units a day and the lead time is 4 days. What should the re-order level be?

150 + 50 × 4 = 350 units.

Give two costs of holding too much inventory.

Any two of: cash tied up (opportunity cost); storage costs; risk of damage, theft or obsolescence; handling costs.

What is the main risk of just in time?

Production depends on suppliers delivering exactly on time; a delay stops production because there is no spare inventory.

Why does supply chain management matter?

Because the business depends on every link, from suppliers to delivery; good coordination lowers inventory and costs and makes deliveries faster and more reliable.

Now practise it

Try the 41 past paper questions on Inventory management, with mark schemes. Start with the most recent ones; if one goes wrong, come back to the section above that covers it.

Practise Inventory management questions →